Turnkey Pipeline Construction in the Permian Basin
Gas, crude, and produced water systems in steel, poly, and composite. Engineered, installed, tested, and tied in by Encore crews.
Encore self-performs turnkey pipeline construction across the Permian and Delaware Basin. We take a project from right-of-way prep through commissioning under one contract, so you're coordinating with one crew, not stitching together a chain of subs.
We build gas gathering and transmission lines, crude oil systems, and produced water lines in carbon steel, HDPE/poly, and composite, matched to the service, pressure, and terrain. Whether it's a single tie-in or a field-wide build, the same crews who broke ground close it out.
What this scope includes
System types
- Gas gathering & transmission
- Crude oil
- Produced water
Materials
- Carbon steel
- HDPE / poly
- Composite
- Fiberglass
Construction methods
- Rock & dirt trenching
- Road bores
- Pipeline insertions
- Pipeline replacements
- Pipeline padding
Process
- ROW prep & clearing
- Welding & fusion
- Hydrostatic testing
- Tie-ins
- Commissioning
Delivery
- Single-contract accountability from first joint to final walk-down
Why operators choose us for this work
Self-performed crews. The people who bid it are the people who build it.
Material-agnostic. Steel, poly, and composite under one roof, so the line is built right for the service, not for our convenience.
Permian-specific. We know this basin's soil, ROW conditions, and operator standards.
200+ full-time workforce. Schedule certainty, not a labor-broker scramble.
Other work we self-perform
Have a turnkey scope to price?
Tell us what you need built. We'll bid it like the crew that has to build it, because we are.