Saltwater disposal facility with tanks and piping in West Texas
SWD Systems

Saltwater Disposal (SWD) System Construction

Produced water gathering, transfer, and disposal infrastructure built for the realities of Permian water: corrosive, high-volume, and heavily regulated.

Overview

Produced water is the Permian's biggest logistics problem. Encore builds the systems that move and dispose of it, from field gathering lines to the disposal facility and injection tie-ins.

We build SWD systems in poly and composite where corrosion resistance matters, and steel where it doesn't, and we build them to the standards the Texas Railroad Commission and New Mexico OCD expect. One contractor from the gathering line to the disposal well.

Capabilities

What this scope includes

Gathering & transfer

  • Produced water gathering lines
  • Transfer lines
  • Pump & transfer stations

Facility & disposal

  • SWD facility piping
  • Injection / disposal well tie-ins
  • Manifolds

Materials

  • HDPE / poly
  • Composite
  • Steel, selected for corrosion service

Compliance

  • Built to TRRC (TX) standards
  • Built to NMOCD (NM) standards
Why Encore

Why operators choose us for this work

01

Corrosion-aware by default. We spec poly and composite for produced water service, not steel out of habit.

02

Full SWD scope under one contract, from gathering line through disposal well tie-in.

03

Permian regulatory fluency in both TX and NM.

04

Built for high-volume Permian water from day one.

Have an SWD build to scope?

Tell us what you need built. From gathering line to disposal well, we self-perform the whole scope.

Request a Bid